Missouri electricity ran $37.84 per million Btu in 2024. A furnace that wastes some of that energy as heat loss means paying for Btu the house never gets.

Efficiency is worth checking closely

With a new furnace going in, the efficiency rating on the unit matters more here than in a place with cheaper power. Two furnaces that cost the same to install can cost different amounts every month after that.

7 months
October through April, your furnace is on duty
24°F
the average winter night it heats against
80% AFUE
the federal minimum any new unit must meet
Isometric cutaway illustration of a single-story house showing interior rooms with furniture, a metal ductwork network, and a furnace unit connected to a vertical flue through the dark shingled roof.
Your furnace works hardest from November through March.

NOAA nClimDiv, 1991–2020 normals

More than half the homes in Callaway County heat with electricity, more than any other fuel.

An electric furnace going in here is replacing what was probably already there.

Get it installed before October, not after the first cold night

Heat runs October through April
Winter nights average 24°F
Climate zone 4A

Callaway County falls under zone 4A in the 2021 energy code, a mixed climate that asks real work of both the furnace and the AC. Any gas furnace going in has to clear a federal efficiency floor: at least 80 percent of the gas it burns has to become heat over the winter. That floor rises to 95 percent for units built on or after December 18, 2028, so what counts as compliant is about to change. A furnace built before that date and sold under the old rule can still go in until it's gone. Ask what rating a unit carries and the date it was built, not just the date it's installed.

Check the efficiency rating before you decide

Ask for the efficiency rating before you settle on a unit. Two furnaces at the same price can run up different numbers every month once the cold sets in, and here the power to run either one costs more than it does most places.

Find a contractor
A gray gas furnace with attached ductwork and piping installed in an unfinished concrete basement.

Sized for the house, not the nameplate

A furnace that's too big for the house will short cycle. It fires up, blasts the place with heat, hits the thermostat setting, and shuts off before it's finished a full run. That means the air never gets fully circulated, so you get hot and cold spots in different rooms. It also means the blower and burner are starting and stopping far more than they should, and that wear adds up on the ignitor, the heat exchanger and the motor. Too small, and the furnace runs long stretches without ever catching up on the coldest days, straining to hold a temperature it can't quite reach. Sizing a furnace right means a contractor works out the heat loss of the house, how fast it loses warmth through the walls, windows and roof, not just the square footage. That calculation accounts for insulation, window area, ceiling height and how the house is laid out. A unit sized off square footage alone can end up wrong in either direction. The right size runs in long, steady cycles that bring the house to temperature and hold it there without constantly starting and stopping.

Ask what the stages and speeds actually do

A single-stage furnace runs on or off, nothing between. A two-stage unit can fire on a lower flame and hold there most of the time, saving the full blast for the coldest stretches. A variable-speed blower adjusts airflow in small steps instead of jumping straight to full speed. Ask how many stages the burner has and whether the blower is variable-speed, since two furnaces that look the same on paper can run very differently once installed.

Ask what happens to the warranty if someone else installs it

Most furnace warranties cover the heat exchanger and other parts for years, but the fine print usually requires a licensed contractor to install and register the unit. Some manufacturers also require the same contractor to handle annual service for the full warranty to stand. Before comparing prices, ask each contractor what the warranty actually covers and what could void it, because a cheaper install that skips a step can cost more the first time something fails.

That AFUE percentage on the label is a measure of how much of the fuel the furnace burns actually turns into heat in your house over a full winter, not just at full blast on a test bench. The rest goes out the flue as exhaust. A furnace sitting unused doesn't lose anything, so the rating only means something once it's running, and a furnace runs most of the winter whenever the thermostat calls for heat. Two units can carry different ratings and still look almost identical from the outside, since the difference is in the heat exchanger design and how much heat gets pulled out of the combustion gas before it leaves the house. A higher rating usually means a second heat exchanger stage, which is also why high-efficiency furnaces vent through PVC pipe instead of a metal flue, the exhaust is cool enough by the time it leaves to not need metal. None of that shows up by looking at the unit. It only shows up on the label and in what the thermostat asks of it all winter.

Installation day starts with the old furnace coming out, and that part goes fast. The slower work is everything around it. A contractor checks the venting, because a new furnace often needs a different vent than the one already in place, and that can mean new pipe run to the outside wall. The gas line gets checked for the right size and a tight connection at the valve. Ductwork gets looked at too, since the supply and return have to match what the new blower is moving, not just hook up to whatever was there before. Once the unit is set and connected, it gets fired up and run through its paces: checking the flame, checking the temperature rise across the heat exchanger, checking that the blower is moving the right amount of air. A furnace that looks done but hasn't been tested under a full heating cycle isn't actually finished.